Malaysia-based KJTS Group has secured a 20-year agreement to upgrade and operate a chiller plant at Synphaet Ramintra Hospital in Bangkok, marking its first cooling-as-a-service project in Thailand’s healthcare sector.
KJTS said its Thai subsidiary, KJTN Engineering Company Limited, signed the design, build and operate agreement with Synphaet Company Limited for the hospital’s Building 2.
KJTN Engineering will fund about THB22.7 million ($700,000) in capital expenditure for the chiller upgrade, construction and project-management work. The subsidiary will design and upgrade the plant, operate and maintain it, and supply chilled water to the hospital.
The agreement provides for a fixed monthly payment and a variable fee based on metered chilled-water consumption, according to KJTS. Ownership of the upgraded chiller plant will transfer to Synphaet when the service period ends.
The retrofit will replace major equipment and add integrated controls and real-time remote monitoring. KJTS said the system will adjust operations according to cooling demand and weather conditions, with the aim of reducing energy consumption while maintaining the hospital’s cooling requirements.
Construction is scheduled to run from December 2026 through May 2027. The 20-year service period is expected to begin in May 2027 and continue through April 2047.
The project extends KJTS’s Thailand business beyond hospitality. The group already manages long-term cooling agreements with several Centara properties, including four 20-year agreements announced in September for hotels in Bangkok, Hua Hin, Pattaya and Koh Samui.
KJTS provides energy-management and facilities-management services in Malaysia, Singapore and Thailand. Its cooling-as-a-service model combines upfront investment in equipment with recurring payments for operations, maintenance and chilled-water supply.
Synphaet Ramintra is part of the Synphaet hospital network in Thailand. The parties did not disclose a total contract value, expected revenue contribution or energy-savings target for the hospital project.
Automation review notes
Source: https://drive.google.com/drive/folders/1iGbpXKvsxiLISEgTH99Vkp7LqfoNr26Q
Triage score 84/100. Direct KJTS PR email and attached release (message 1a1ede2a83be16e9) were the primary source; BusinessToday and New Straits Times independently corroborated the agreement, duration and THB22.7 million investment. Regional relevance: a Malaysian energy-services company is expanding a long-term cooling infrastructure model into Thailand’s healthcare sector. TNGlobal company/event searches found no current duplicate; Gmail thread and Sent searches, Drive Ready search and Automation Draft Log search found no assignment or duplicate. The source URL is the official press-kit folder supplied by KJTS because no dedicated company news page for this announcement was available at sweep time. Total contract value, revenue contribution and quantified energy savings were not disclosed. No embargo. Image: No image; the email’s inline image was a sender signature and the supplied press kit was not used for visual rights without a clearly identified story image. Editor should verify the THB-to-dollar conversion at publication if retained.

